62 Beatrix
£995 pcm
Property Features
- Managed
- 2 double bedrooms
- Flat/apartment
- Allocated parking for 1 car
- Balcony
- Part-furnished
- Great links for commuting
Property Summary
A 2 bedroom apartment on the 1st floor of Beatrix building in Victoria Wharf. Part-furnished with allocated parking.
The property is comprised of an entrance hall, a good sized lounge with enough room for a dining table and chairs and a door out to the balcony, a fitted kitchen, 2 double bedrooms both with built in wardrobes, an en suite shower bathroom, and a family bathroom with a shower over the bath.
The property comes with 1 allocated parking space, and the development boasts a fob entry system and 24 hr concierge.
The development is situated just off the dual carriage way to Cardiff City Centre, Penarth and Barry, and the M4. There is a bus stop just outside the development with regular buses into Cardiff. The Cardiff Bay train station is only a short drive away.
Council Tax band E.
The heating and water is all electric.
There is no gas.
There is water, but it is paid for through the service charges that the landlord pays.
There is a cladding issue in Victoria Wharf and work is expected to start in April 2025.
The property is comprised of an entrance hall, a good sized lounge with enough room for a dining table and chairs and a door out to the balcony, a fitted kitchen, 2 double bedrooms both with built in wardrobes, an en suite shower bathroom, and a family bathroom with a shower over the bath.
The property comes with 1 allocated parking space, and the development boasts a fob entry system and 24 hr concierge.
The development is situated just off the dual carriage way to Cardiff City Centre, Penarth and Barry, and the M4. There is a bus stop just outside the development with regular buses into Cardiff. The Cardiff Bay train station is only a short drive away.
Council Tax band E.
The heating and water is all electric.
There is no gas.
There is water, but it is paid for through the service charges that the landlord pays.
There is a cladding issue in Victoria Wharf and work is expected to start in April 2025.